{"id":12,"date":"2022-02-01T15:07:23","date_gmt":"2022-02-01T21:07:23","guid":{"rendered":"http:\/\/projects.511wi.gov\/wis145\/full-project-overview\/"},"modified":"2022-02-15T11:21:43","modified_gmt":"2022-02-15T17:21:43","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/wis145\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p>WisDOT will begin construction work for planned improvements on WIS 145 in Milwaukee County. Improvements include:<\/p>\n<ul>\n<li>Four-miles of pavement resurfacing along WIS 145 between 68th Street and Good Hope Road\n<ul>\n<li>The facility will be restriped as a four-lane roadway<\/li>\n<li>The improvement will make use of the existing two inside travel lanes in each direction<\/li>\n<li>The outside lane will be converted to a wider shoulder and ramp acceleration and deceleration lanes will be lengthened to allow additional space to merge with mainline traffic<\/li>\n<li>Improvements also include upgrades to the drainage facilities, shoulders, barriers, and guard rail along WIS 145.<\/li>\n<\/ul>\n<\/li>\n<li>Shoulder resurfacing and guardrail replacement on WIS 145 between Good Hope Road and West Crossover Pass.<\/li>\n<li>Bridge deck replacement and painting of the Grantosa Drive bridge over WIS 145.<\/li>\n<li>Spot repairs and painting to the WIS 145 bridges over the Union Pacific RR and Flagg Avenue<\/li>\n<li>Thin Polymer overlays will be placed on eight bridges:\n<ul>\n<li>WIS 145 NB and SB over N 91st Street<\/li>\n<li>WIS 145 NB and SB over W. Mill Road<\/li>\n<li>WIS 145 NB and SB over the Little Menomonee Parkway<\/li>\n<li>WIS 175 (Appleton Avenue) over Silver Spring Drive<\/li>\n<li>WIS 181 (N. 76th Street) over Silver Spring Drive<\/li>\n<\/ul>\n<\/li>\n<li>Eight new Sign Structures will be installed along the WIS 145 corridor.<\/li>\n<li>107th Street Bridge Replacement over WIS 145 (summer 2022)<\/li>\n<li>Culvert concrete surface repair, fencing and storm sewer repair at two culverts under I-41.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Schedule: Late February to Fall 2022<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>WisDOT is beginning construction work along WIS 145 (Fond du Lac Freeway), the WIS 175 (Appleton Avenue) bridges over Silver Spring Drive and the WIS 181 (N. 76th Street) bridges over Silver Spring Drive.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":44,"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/posts\/12\/revisions\/44"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis145\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}