{"id":12,"date":"2015-03-20T18:18:34","date_gmt":"2015-03-20T23:18:34","guid":{"rendered":"http:\/\/projects.511wi.gov\/westcentral\/full-project-overview\/"},"modified":"2015-08-21T13:24:57","modified_gmt":"2015-08-21T18:24:57","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/westcentral\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p>Construction on I-94 in the Northwest Region is underway.\u00a0 Details on the projects can be found below.<\/p>\n<p><strong>2015 Construction Projects &#8211; Fact Sheets<\/strong><\/p>\n<ul>\n<li id=\"aui_3_2_0_1119\"><a href=\"http:\/\/projects.511wi.gov\/westcentral\/wp-content\/uploads\/sites\/149\/County-T-County-BB1.pdf\">County T County BB<\/a>\u00a0&#8211; St. Croix County (project complete)<\/li>\n<li id=\"aui_3_2_0_1175\"><a href=\"http:\/\/projects.511wi.gov\/westcentral\/wp-content\/uploads\/sites\/149\/County-BB-WIS-1282.pdf\">County BB to WIS 128<\/a>\u00a0&#8211; St. Croix County<\/li>\n<li><a href=\"http:\/\/projects.511wi.gov\/westcentral\/wp-content\/uploads\/sites\/149\/Red-Cedar-US-12-1.pdf\">Red Cedar River to US 12\/WIS 29<\/a>&#8211;\u00a0Dunn County (project complete)<\/li>\n<li><a href=\"http:\/\/projects.511wi.gov\/westcentral\/wp-content\/uploads\/sites\/149\/WIS-312-US-12-WIS-291.pdf\">WIS 312 to US 12\/WIS 29<\/a><a href=\"http:\/\/projects.511wi.gov\/westcentral\/wp-content\/uploads\/sites\/149\/WIS-312-US-12-WIS-29.pdf\">\u00a0<\/a>-Dunn\/Eau Claire\u00a0County<\/li>\n<li id=\"aui_3_2_0_1171\"><a href=\"http:\/\/projects.511wi.gov\/westcentral\/wp-content\/uploads\/sites\/149\/Perry-Creek-County-O1.pdf\">County O to Perry Creek<\/a>\u00a0&#8211; Jackson\u00a0County<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p style=\"padding-bottom: 10px 5px 20px 5px;text-align: justify\">Over the next several years we will be making many improvements to I-94 from the St. Croix River through Jackson County. For that reason, we are providing you with information on all corridor projects in this one location titled &#8220;West Central Freeway Projects&#8221;.\u00a0 To minimize traffic impacts,\u00a0the majority of work\u00a0will be\u00a0done during the evening\/overnight hours with all lanes open to traffic during the day.\u00a0 Click on Full Overview below for specific project details.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":21,"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":149,"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/posts\/12\/revisions\/149"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/westcentral\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}