Verona Road (US 18/151) Project

Fitchburg and Madison, Dane County

Exhibits

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Stage 1 improvements

Beltline (US 12/18) from Whitney Way – Seminole Highway
Verona Road (US 18/151) from Raymond Road – Nakoma Road
Construction: 2013 to fall 2016

VIDEO: Narrated drive-through simulation video of Verona Road, Stage 1 (circa 2016)

Stage 2 improvements

Verona Road from County PD (McKee Road) – Raymond Road
Construction: fall 2016 to 2020

VIDEO: Narrated drive-through simulation video of Verona Road, Stage 2 (circa 2020)

Other exhibits

Stage 3

This stage is not scheduled to occur for 20-30 years.

Noise barrier locations and information