{"id":12,"date":"2025-04-16T11:18:56","date_gmt":"2025-04-16T16:18:56","guid":{"rendered":"https:\/\/projects.511wi.gov\/us8lincoln\/full-project-overview\/"},"modified":"2025-10-08T08:34:52","modified_gmt":"2025-10-08T13:34:52","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/us8lincoln\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p>Crews will:<\/p>\n<ul>\n<li>Remove 2-inches of the existing asphalt pavement and replacing with 2-inches of new asphalt pavement the entire length of the project.<\/li>\n<li>Widen the asphalt portion of the shoulder from 3 feet to 5 feet from County Y to the east project limits.<\/li>\n<li>Replace the existing thermoplastic pavement marking at snowmobile crossing located 3 miles east of McCord.<\/li>\n<li>Road and adding thermoplastic pavement markings at four additional snowmobile crossings.<\/li>\n<li>Replace the existing guardrails connected to the roadway bridge over the Tomahawk River.<\/li>\n<li>Replace the curb and gutter at the County U intersection.<\/li>\n<li>Replace the existing railroad crossing, the roadway approaches, drainage culverts and vision triangle clearing for federal railroad safety requirements at the Fox Valley and Lake Superior railroad crossing.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Crews will repave the road, widen the asphalt shoulders and replace the existing railroad crossing.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":4,"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":63,"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/posts\/12\/revisions\/63"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/us8lincoln\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}