{"id":14,"date":"2025-02-21T15:23:37","date_gmt":"2025-02-21T21:23:37","guid":{"rendered":"https:\/\/projects.511wi.gov\/nwr21\/delays\/"},"modified":"2026-09-04T14:30:03","modified_gmt":"2026-09-04T19:30:03","slug":"trafficimpacts","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/us63millpond\/trafficimpacts\/","title":{"rendered":"Traffic Impacts"},"content":{"rendered":"<p>US 63 remains open to a single lane of traffic controlled by temporary traffic signals between Delta Drummond Road to Drummond Lake Road.<\/p>\n<ul>\n<li>Starting on Tuesday, Sept. 8, traffic will be detoured for one week via County N, County A and US 2 for culvert pipe installation.<\/li>\n<\/ul>\n<p>During construction in 2027:<\/p>\n<ul>\n<li>US 63 will remain open, but motorists will use a single-lane bypass to get around the work zone.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>US 63 remains open to a single lane of traffic controlled by temporary traffic signals between Delta Drummond Road to Drummond Lake Road. Starting on Tuesday, Sept. 8, traffic will be detoured for one week via County N, County A and US 2 for culvert pipe installation. During construction in 2027: US 63 will remain [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-default.php","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"class_list":["post-14","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/pages\/14","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/comments?post=14"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/pages\/14\/revisions"}],"predecessor-version":[{"id":47,"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/pages\/14\/revisions\/47"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us63millpond\/wp-json\/wp\/v2\/media?parent=14"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}