{"id":12,"date":"2022-01-25T02:41:27","date_gmt":"2022-01-25T08:41:27","guid":{"rendered":"http:\/\/projects.511wi.gov\/us53bc1\/full-project-overview\/"},"modified":"2026-02-04T10:23:35","modified_gmt":"2026-02-04T16:23:35","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/us53bc1\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p>Construction in 2026 includes:<\/p>\n<ul>\n<li>Replacing the decks on the bridges over the Chetek River and 20th Street<\/li>\n<li>Replacing the bridge over County I<\/li>\n<li>Milling pavement on both sides of each structure and placing new asphalt pavement on the approaches<\/li>\n<li>Milling and overlaying the pavement on the southbound US 53 on- and off-ramps at the County I interchange<\/li>\n<li>Replacing guardrail, pavement markings and signage<\/li>\n<\/ul>\n<p>Construction in 2025 included replacing the decks on the bridges over County AA and County A and overlaying the decks with concrete on bridges over Carlson School Road, Knapp Street and US 8.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Wisconsin Department of Transportation is rehabilitating seven bridges and replacing one structure between New Auburn and Cameron in Barron County during the two-year project.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":6,"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":187,"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/posts\/12\/revisions\/187"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/us53bc1\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}