{"id":5,"date":"2026-02-24T15:14:44","date_gmt":"2026-02-24T21:14:44","guid":{"rendered":"https:\/\/projects.511wi.gov\/us51lincoln\/schedule\/"},"modified":"2026-05-01T08:49:04","modified_gmt":"2026-05-01T13:49:04","slug":"schedule","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/us51lincoln\/schedule\/","title":{"rendered":"Schedule and Traffic Impacts"},"content":{"rendered":"<p><strong>Page last updated: <\/strong>May 1, 2026<\/p>\n<p><strong>Schedule: <\/strong>April 6 to June 19, 2026<\/p>\n<p><strong>Anticipated work scheduled: <\/strong>Crews will:<\/p>\n<ul>\n<li>Continue concrete removal and replacement<\/li>\n<li>Begin replacing bridge approach slabs<\/li>\n<li>Continue structure work at various structures<\/li>\n<li>Mill asphalt surfaces<\/li>\n<\/ul>\n<p><strong>Traffic impacts (the next 10 days):\u00a0<\/strong><\/p>\n<ul>\n<li>US 51 will be closed to through traffic from US 8 to County L.<\/li>\n<li>US 51 traffic will be detoured using US 8 and WIS 47.<\/li>\n<li><strong>This detour will remain in place until noon May 21, 2026. The road will be open for Memorial Day weekend<\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Page last updated: May 1, 2026 Schedule: April 6 to June 19, 2026 Anticipated work scheduled: Crews will: Continue concrete removal and replacement Begin replacing bridge approach slabs Continue structure work at various structures Mill asphalt surfaces Traffic impacts (the next 10 days):\u00a0 US 51 will be closed to through traffic from US 8 to [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":39,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-default.php","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-5","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/pages\/5","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/comments?post=5"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/pages\/5\/revisions"}],"predecessor-version":[{"id":42,"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/pages\/5\/revisions\/42"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/media\/39"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us51lincoln\/wp-json\/wp\/v2\/media?parent=5"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}