Overview
The proposed work to the roadway will be milling 3 inches and a 4-inch overlay, along with joint repairs and base patching, along with many more improvements.
- Construction begins: Mid-July 2022
The proposed work to the roadway will be milling 3 inches and a 4-inch overlay, along with joint repairs and base patching, along with many more improvements.
- Construction begins: Mid-July 2022