{"id":12,"date":"2024-05-29T12:26:09","date_gmt":"2024-05-29T17:26:09","guid":{"rendered":"https:\/\/projects.511wi.gov\/us12jc\/full-project-overview\/"},"modified":"2026-03-10T12:48:17","modified_gmt":"2026-03-10T17:48:17","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/us12dc\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p>Construction includes:<\/p>\n<ul>\n<li>Milling 2.25 inches of existing asphalt and paving 3.25 inches of hot-mix asphalt in rural areas<\/li>\n<li>Milling 3.25 inches of existing asphalt and paving 3.25 inches of hot-mix asphalt in urban areas<\/li>\n<li>Replacing joints on the Eighteen Mile Creek Bridge in village of Colfax<\/li>\n<li>Placing centerline rumble strips in rural areas<\/li>\n<li>Replacing cross culverts, guardrail and sidewalk curb ramps<\/li>\n<li>Replacing the railroad crossing in the village of Colfax\n<ul>\n<li>This work will be completed by the railroad.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Wisconsin Department of Transportation is resurfacing a segment of US 12 from Princeton Drive in Elk Mound to just north of WIS 29 and a segment of WIS 40 from US 12 to County M in Colfax.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":109,"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/posts\/12\/revisions\/109"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12dc\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}