{"id":72,"date":"2015-03-18T15:09:14","date_gmt":"2015-03-18T20:09:14","guid":{"rendered":"http:\/\/projects.511wi.gov\/us12corridor\/?page_id=72"},"modified":"2016-02-24T14:55:46","modified_gmt":"2016-02-24T20:55:46","slug":"south-section-schedule","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/us12corridor\/south-section-schedule\/","title":{"rendered":"South section &#8211; Schedule"},"content":{"rendered":"<p>For more information on Public Involvement Meetings (PIM), hearings and other public activities, visit <a href=\"http:\/\/projects.511wi.gov\/us12corridor\/south-section-public-involvement\/\">Public involvement<\/a>.<\/p>\n<h3>Current <b>(this year)<\/b><\/h3>\n<p>2016<\/p>\n<ul>\n<li>Construction continues on US 12 bypass from Terrytown Road to Point of Rocks<\/li>\n<li>Construction continues on large bridges at Baraboo River, Skillet Creek and Skillet Creek Tributary<\/li>\n<li>County Highway W roadway work scheduled to be complete<\/li>\n<li>Fall &#8211; US 12 construction begins south of Point of Rocks to Lehman Road<\/li>\n<\/ul>\n<h3>Future <b>(next year and beyond)<\/b><\/h3>\n<ul>\n<li>Fall 2017 or later &#8211; Construction scheduled to be completed<\/li>\n<\/ul>\n<h3>Past <b>(anything prior to today)<\/b><\/h3>\n<p>2011-2014 &#8211; Continue right of way acquisition and complete final roadway plans<\/p>\n<p>2010<\/p>\n<ul>\n<li>Winter 2010 &#8211; Started appraisals and negotiations for purchase of right of way<\/li>\n<li>Summer 2010 &#8211; Finalize preliminary roadway plans, update environmental study, and prepare final right of way plat<\/li>\n<li><a href=\"http:\/\/projects.511wi.gov\/us12corridor\/south-section-public-involvement\/\">Jan. 13, 2010 &#8211; PIM<\/a><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/projects.511wi.gov\/us12corridor\/south-section-public-involvement\/\/12\/south\/public.htm\">Feb. 2008 &#8211; PIM<\/a><\/p>\n<p>2007 &#8211; Design work started<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For more information on Public Involvement Meetings (PIM), hearings and other public activities, visit Public involvement. Current (this year) 2016 Construction continues on US 12 bypass from Terrytown Road to Point of Rocks Construction continues on large bridges at Baraboo River, Skillet Creek and Skillet Creek Tributary County Highway W roadway work scheduled to be [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-72","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages\/72","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/comments?post=72"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages\/72\/revisions"}],"predecessor-version":[{"id":261,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages\/72\/revisions\/261"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/media?parent=72"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}