{"id":105,"date":"2015-03-18T15:33:49","date_gmt":"2015-03-18T20:33:49","guid":{"rendered":"http:\/\/projects.511wi.gov\/us12corridor\/?page_id=105"},"modified":"2015-06-18T16:22:07","modified_gmt":"2015-06-18T21:22:07","slug":"bikepedestrian-accommodations-environmental-information","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/us12corridor\/bikepedestrian-accommodations-environmental-information\/","title":{"rendered":"Bike\/Pedestrian Accommodations &#8211; Environmental Information"},"content":{"rendered":"<div class=\"imagesRight\"><img loading=\"lazy\" decoding=\"async\" title=\"Wild lupine along a roadway.\" src=\"http:\/\/projects.511wi.gov\/us12corridor\/wp-content\/uploads\/sites\/89\/wildlupine1.jpg\" alt=\"Wild lupine along a roadway.\" width=\"200\" height=\"131\" align=\"right\" hspace=\"5\" \/><\/div>\n<h3>Final Environmental Impact Statement (<a name=\"feis\"><\/a>FEIS)<\/h3>\n<p>Bike\/pedestrian accommodations project was a requirement of the Environmental Impact Statement (EIS) for the US 12 Corridor to provide accommodations for bicycles and pedestrians from existing US 12 (County BD), south of I-90\/94, to US 12 north of I-90\/94, in Lake Delton.<\/p>\n<h3><a href=\"http:\/\/www.dot.wisconsin.gov\/business\/engrserv\/environment\/\" target=\"_blank\">WisDOT environmental information<\/a><\/h3>\n<p>WisDOT projects and construction sometimes change the natural environment around a project area. To minimize the effects of road construction and development WisDOT works to reduce change to the natural environment and leads several efforts to restore project areas.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Final Environmental Impact Statement (FEIS) Bike\/pedestrian accommodations project was a requirement of the Environmental Impact Statement (EIS) for the US 12 Corridor to provide accommodations for bicycles and pedestrians from existing US 12 (County BD), south of I-90\/94, to US 12 north of I-90\/94, in Lake Delton. WisDOT environmental information WisDOT projects and construction sometimes [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-105","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages\/105","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/comments?post=105"}],"version-history":[{"count":2,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages\/105\/revisions"}],"predecessor-version":[{"id":236,"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/pages\/105\/revisions\/236"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us12corridor\/wp-json\/wp\/v2\/media?parent=105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}