Overview
The project consists of the bridge deck replacement on the existing structure over the Rock River. Some reconstruction of roadway approaches on both sides of the bridge will be included to accommodate the new structure.
- May 23 to August 27, 2022 - Construction scheduled
The project consists of the bridge deck replacement on the existing structure over the Rock River. Some reconstruction of roadway approaches on both sides of the bridge will be included to accommodate the new structure.
- May 23 to August 27, 2022 - Construction scheduled