Overview
Work includes removing and replacing the existing pavement with new concrete pavement. Asphalt pavement will be placed on County ET/Veterans Street. The existing pavement has failed joints, panel breaks, potholes and spalls.
- Construction schedule: Mid-June 2023
Work includes removing and replacing the existing pavement with new concrete pavement. Asphalt pavement will be placed on County ET/Veterans Street. The existing pavement has failed joints, panel breaks, potholes and spalls.
- Construction schedule: Mid-June 2023