{"id":5,"date":"2026-04-07T15:28:32","date_gmt":"2026-04-07T20:28:32","guid":{"rendered":"https:\/\/projects.511wi.gov\/us10waupaca\/schedule\/"},"modified":"2026-08-14T14:25:34","modified_gmt":"2026-08-14T19:25:34","slug":"schedule","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/us10waupaca\/schedule\/","title":{"rendered":"Schedule and Traffic Impacts"},"content":{"rendered":"<p><strong>Page last updated: <\/strong>Aug. 14, 2026<\/p>\n<p><strong>Schedule: <\/strong>May 4 to Sept. 18, 2026<\/p>\n<p><strong>Anticipated work scheduled: <\/strong>Crews will:<\/p>\n<ul>\n<li>US 10 westbound\n<ul>\n<li>Complete concrete pavement repair and replacement on the outside lane (driving lane)<\/li>\n<\/ul>\n<\/li>\n<li>WIS 49\/54\n<ul>\n<li>Start concrete pavement repair and replacement work on the westbound off ramp<\/li>\n<li>Continue bridge repair work<\/li>\n<\/ul>\n<\/li>\n<li>WIS 22\n<ul>\n<li>Complete concrete pavement repair and replacement work.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Traffic impacts (the next 10 days):\u00a0<\/strong><\/p>\n<ul>\n<li>US 10\n<ul>\n<li>The westbound outside lane (driving lane) and shoulder are closed from Vaughan Road to Anderson Road.<\/li>\n<li>The eastbound inside lane (passing lane) and shoulder are closed from Anderson Road to WIS 54.<\/li>\n<\/ul>\n<\/li>\n<li>WIS 22 South \/ Lakeside Parkway\n<ul>\n<li>The southbound inside lane is closed from \u00bc mile north to \u00bc mile south of US 10.<\/li>\n<li>The northbound outside lane is closed from \u00bc mile north to \u00bc mile south of US 10.<\/li>\n<li>WIS 22 will be temporarily opened from Friday, Aug. 14, 2026, at 5 pm through Monday, Aug. 17 at 6 am.<\/li>\n<\/ul>\n<\/li>\n<li>WIS 49\/54\n<ul>\n<li>The westbound off ramp from US 10 is closed. Weather permitting the ramp will open on Wednesday, Aug. 26. Motorist should follow posted detour<\/li>\n<li>The eastbound and westbound outside lane and shoulder will be closed from west of County QQ to Covered Bridge Road.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Page last updated: Aug. 14, 2026 Schedule: May 4 to Sept. 18, 2026 Anticipated work scheduled: Crews will: US 10 westbound Complete concrete pavement repair and replacement on the outside lane (driving lane) WIS 49\/54 Start concrete pavement repair and replacement work on the westbound off ramp Continue bridge repair work WIS 22 Complete concrete [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-default.php","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"class_list":["post-5","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/pages\/5","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/comments?post=5"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/pages\/5\/revisions"}],"predecessor-version":[{"id":59,"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/pages\/5\/revisions\/59"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/us10waupaca\/wp-json\/wp\/v2\/media?parent=5"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}