Project Overview
Project Overview
Approximately 1.4-miles of WIS 50 (75th Street) will be reconstructed in the village of Paddock Lake.
Improvements Include
- Replacement of pavement and curb and gutter
- Storm sewer improvements
- Sidewalk extension on east and west end of the project
- Sidewalk ramps will be improved to meet ADA standards
- Traffic signals will be replaced with monotubes at WIS 83 and 246th Avenue along with turn lane improvements.
- The monotube equipment will help with visibility at the WIS 83 and 246th Avenue intersections by
locating the signal head over the travel lane.
- The monotube equipment will help with visibility at the WIS 83 and 246th Avenue intersections by
- The two existing retaining walls on the north side of WIS 50 between 246th Avenue and 248th Avenue will be replaced.
- A five-foot gutter pan will provide for on road bicycle accommodations.