{"id":12,"date":"2016-09-07T19:41:32","date_gmt":"2016-09-08T00:41:32","guid":{"rendered":"http:\/\/projects.511wi.gov\/oliver-bridge\/full-project-overview\/"},"modified":"2017-09-25T11:29:32","modified_gmt":"2017-09-25T16:29:32","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/oliver-bridge\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p>CN is continuing the second and final year of a major maintenance and strengthening project on the Oliver railroad bridge over the St. Louis River between Duluth, Minnesota and Oliver, Wisconsin. The bridge strengthening project, part of CN\u2019s 2017 capital program, is a major investment in the continuing safety and efficiency of CN\u2019s Wisconsin and Minnesota railroad network.<\/p>\n<p>April &#8211; November 2017, motorists can expect daily road closures on Oliver Bridge.<\/p>\n<p>See the <a href=\"http:\/\/www.dot.state.mn.us\/d1\/projects\/Oliver-Bridge-Rehabilitation\/index.html\">MnDOT Project Site<\/a> for more details.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>April through November 2017: Daytime closures of the roadway beneath the rail bridge connecting Wisconsin Hwy 105 to Minnesota Hwy 39.<\/p>\n<p>The highway portion of the bridge will be closed to traffic between 8 a.m. and 5 p.m. Monday through Friday. The daily closures will continue into the fall. CN has worked with the Minnesota and Wisconsin departments of transportation on the closure signage.<\/p>\n<p>See the\u00a0<a href=\"http:\/\/www.dot.state.mn.us\/d1\/projects\/Oliver-Bridge-Rehabilitation\/index.html\">MnDOT Project Site<\/a>\u00a0for more details.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":15,"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":55,"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/posts\/12\/revisions\/55"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/oliver-bridge\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}