{"id":3,"date":"2026-01-14T13:23:45","date_gmt":"2026-01-14T19:23:45","guid":{"rendered":"https:\/\/projects.511wi.gov\/national-avenue\/overview\/"},"modified":"2026-02-17T10:56:56","modified_gmt":"2026-02-17T16:56:56","slug":"overview","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/national-avenue\/","title":{"rendered":"Overview"},"content":{"rendered":"<p>The City of Milwaukee, in partnership with the Wisconsin Department of Transportation (WisDOT), plans to rebuild 2.6-miles of W. National Avenue (WIS 59).<\/p>\n<p>National Avenue is currently an urban 4-lane, undivided principal arterial roadway and connecting highway. The proposed rebuild consists of improving safety measures for all modes of transportation, including walking and biking.<\/p>\n<p>Construction for the project will take place over three years in three separate segments:<\/p>\n<ul>\n<li>2026 &#8211; 39th to 27th Street<\/li>\n<li>2027 &#8211; 11th to 1st Street<\/li>\n<li>2028 &#8211; 27th to 11th Street<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The City of Milwaukee, in partnership with the Wisconsin Department of Transportation (WisDOT), plans to rebuild 2.6-miles of W. National Avenue (WIS 59). National Avenue is currently an urban 4-lane, undivided principal arterial roadway and connecting highway. The proposed rebuild consists of improving safety measures for all modes of transportation, including walking and biking. Construction [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":33,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-overview.php","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-3","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/pages\/3","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/comments?post=3"}],"version-history":[{"count":2,"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/pages\/3\/revisions"}],"predecessor-version":[{"id":34,"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/pages\/3\/revisions\/34"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/media\/33"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/national-avenue\/wp-json\/wp\/v2\/media?parent=3"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}