{"id":12,"date":"2025-02-10T14:57:33","date_gmt":"2025-02-10T20:57:33","guid":{"rendered":"https:\/\/projects.511wi.gov\/mitchellresurf\/full-project-overview\/"},"modified":"2026-04-13T16:33:54","modified_gmt":"2026-04-13T21:33:54","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/mitchellresurf\/full-project-overview\/","title":{"rendered":"Project Details"},"content":{"rendered":"<p>This WisDOT project will make improvements to approximately 6.5 miles of I-41\/I-43\/I-94\/I-894, through the Mitchell Interchange, in Milwaukee County. The project limits are between Rawson Avenue to the south, Howard Avenue to the north, and 35th Street to the west.<\/p>\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/mitchellresurf\/wp-content\/uploads\/sites\/1348\/projectlimits.png\">View project limits<\/a><\/li>\n<\/ul>\n<p><strong>2026 Construction:<\/strong><\/p>\n<p>Work on this project is scheduled to resume on late March 2026. See <a href=\"https:\/\/projects.511wi.gov\/mitchellresurf\/project-updates\/\">Project Updates<\/a> page for more information.<\/p>\n<p><strong>2026 Traffic Impacts:<\/strong><\/p>\n<p>The majority of the work will be completed during overnight hours with lane and ramp closures. Some work will require traffic impacts to weekend and daily traffic:<\/p>\n<ul>\n<li>Extended weekend full closures\n<ul>\n<li>One weekend full closure of the southbound I-43\/94 to westbound I-894 system ramp<\/li>\n<li>One weekend full closure of the eastbound I-894 to northbound I-43\/94 system ramp<\/li>\n<li>One weekend full closure of the I-94\/43 northbound collector distributer lanes between College Avenue and Layton Avenue<\/li>\n<li>One weekend full closure of the I-94\/43 southbound collector distributor lanes between Layton Avenue and College Avenue<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Access to local businesses and residences will be maintained at all times.<\/p>\n<p><strong>Project Improvements:<\/strong><\/p>\n<p>This project will improve pavement conditions and ride quality and include structural maintenance. The entire corridor will be resurfaced with asphalt. Additional improvements include:<\/p>\n<ul>\n<li>Milling and patching<\/li>\n<li>Replace High Friction Surface Treatments<\/li>\n<li>Joint maintenance at bridge approaches<\/li>\n<li>Repairs to retaining walls<\/li>\n<li>Various improvements to College Avenue park and ride lots<\/li>\n<li>Various drainage improvements<\/li>\n<li>New pavement markings and signing<\/li>\n<\/ul>\n<p><strong>Schedule:<\/strong><\/p>\n<p>Work is scheduled to begin in early September 2025 and be completed by fall 2026. Work was paused during the winter months and is resuming in late March 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This WisDOT project will make improvements to approximately 6.5 miles of I-41\/I-43\/I-94\/I-894, through the Mitchell Interchange, in Milwaukee County. The project limits are between Rawson Avenue to the south, Howard Avenue to the north, and 35th Street to the west.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":65,"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/posts\/12\/revisions\/65"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/mitchellresurf\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}