{"id":51,"date":"2017-01-06T15:35:32","date_gmt":"2017-01-06T21:35:32","guid":{"rendered":"http:\/\/projects.511wi.gov\/maintain-ne\/?p=51"},"modified":"2026-11-27T11:33:42","modified_gmt":"2026-11-27T17:33:42","slug":"impacts","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/maintain-ne\/impacts\/","title":{"rendered":"Highway Maintenance Traffic Impacts in Northeast Wisconsin"},"content":{"rendered":"<h3>Scheduled traffic impacts week of November 30<\/h3>\n<p>The Wisconsin Department of Transportation (WisDOT) Northeast Region provides a weekly list of expected upcoming traffic impacts for maintenance work on state highways in Northeast Wisconsin and maintenance\/inspections on the state&#8217;s lift bridges. Maintenance is provided by county highway department crews or WisDOT Bureau of Structures bridge experts. Maintenance operation schedules can change due to weather and maintenance crew manpower. Check back often for schedule and traffic impact updates throughout the week.<\/p>\n<p>For more information, please contact Missy Kok or Mark Kantola<br \/>\n<a href=\"mailto:Melissa2kok@dot.wi.gov\">Melissa2.kok@dot.wi.gov<\/a> or call (920) 492-5743<br \/>\n<a href=\"mailto:Mark.Kantola@dot.wi.gov\">Mark.Kantola@dot.wi.gov<\/a> or call (920) 492-4153<\/p>\n<p>SB=Southbound NB=Northbound EB=Eastbound WB=Westbound<\/p>\n<p><strong>Northeast Wisconsin Lift Bridge 2026 Routine Maintenance and Inspections<\/strong><\/p>\n<p>Bridge engineers and maintenance crews will conduct routine maintenance and inspection of the following lift bridges in Northeast Wisconsin. Work typically includes inspection of the electrical, mechanical, and hydrological systems, along with structural inspections of the infrastructure. Crews will also conduct bridge washing during the annual bridge maintenance. <a href=\"https:\/\/wisconsindot.gov\/Pages\/doing-bus\/eng-consultants\/cnslt-rsrces\/strct\/lift-bridges.aspx\">Please see WisDOT&#8217;s Lift Bridge Information website<\/a> for how WisDOT keeps bridges safe and efficient for all users on state highways.<\/p>\n<p><strong>Brown County<\/strong><\/p>\n<ul>\n<li>Maintenance crews will be repairing cable guard on SB US 41 between Norfield Road and County B on Wednesday, December 2 from 9 a.m. to 2 p.m. A lane closure will be used during repairs.<\/li>\n<\/ul>\n<p><strong>Door County<\/strong><\/p>\n<div>\n<ul>\n<li>Maintenance crews will have utility work on NB and SB WIS 42 between Rainbow Bridge Road and Ball Park Road on Monday, November 23 to Friday, December 4 from 7 a.m. to 5 p.m. A flagging operation will be used during repairs.<\/li>\n<\/ul>\n<p><strong>Manitowoc County<\/strong><\/p>\n<ul>\n<li>Maintenance crews will be repairing pavement on NB and SB I-43 between the north and south county lines on Monday, November 30 to Friday, December 4 from 8 a.m. to 2 pm. A moving lane closure will be used during repairs.<\/li>\n<\/ul>\n<p><strong>Marinette County<\/strong><\/p>\n<ul>\n<li>Maintenance crews will have bridge work on NB and SB US 141 at Little Peshtigo and Cedar Swamp Creek on Monday, November 30 to Friday, December 4 from 7 a.m. to 3 p.m. Various lane closures will be used during repairs.<\/li>\n<\/ul>\n<ul>\n<li>Maintenance crews will have bridge work on NB and SB US 41 between Flame Road and Rodney Lane on Monday, November 30 to Friday, December 4 from 7 a.m. to 3 p.m. Various lane closures will be used during repairs.<\/li>\n<\/ul>\n<p><strong>Sheboygan County<\/strong><\/p>\n<ul>\n<li>Maintenance crews will be surveying on NB I-43 between Wilson Lima Road and County V on Monday, November 30 from 7 a.m. to 3 p.m. A moving lane closure will be used during surveying.<\/li>\n<li>Maintenance crews will be repairing pavement on NB and SB WIS 42 between WIS 32 and the Sheboygan-Manitowoc County line on Monday, November 30 to Thursday, December 3 from 8 a.m. to 2 p.m. A moving lane closure will be used during repairs.<\/li>\n<\/ul>\n<\/div>\n<p><strong>*All maintenance operations are weath<\/strong><strong>er-dependent and subject to change*<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scheduled traffic impacts week of November 30 The Wisconsin Department of Transportation (WisDOT) Northeast Region provides a weekly list of expected upcoming traffic impacts for maintenance work on state highways in Northeast Wisconsin and maintenance\/inspections on the state&#8217;s lift bridges. Maintenance is provided by county highway department crews or WisDOT Bureau of Structures bridge experts. [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-51","post","type-post","status-publish","format-standard","hentry","category-schedule-updates"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/posts\/51","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/comments?post=51"}],"version-history":[{"count":7,"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/posts\/51\/revisions"}],"predecessor-version":[{"id":2020,"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/posts\/51\/revisions\/2020"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/media?parent=51"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/categories?post=51"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/maintain-ne\/wp-json\/wp\/v2\/tags?post=51"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}