{"id":12,"date":"2022-01-25T02:31:58","date_gmt":"2022-01-25T08:31:58","guid":{"rendered":"http:\/\/projects.511wi.gov\/wis48bc\/full-project-overview\/"},"modified":"2026-01-29T08:00:21","modified_gmt":"2026-01-29T14:00:21","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<ul>\n<li>Construction on both bridges includes:\n<ul>\n<li>Replacing the modular and expansion joints<\/li>\n<li>Placing a new polymer overlay on the bridge decks<\/li>\n<li>Making concrete surface repairs<\/li>\n<li>Cleaning of bridge bearings<\/li>\n<li>Replacing pavement markings<\/li>\n<\/ul>\n<\/li>\n<li>Construction on the westbound bridge also includes:\n<ul>\n<li>Making repairs on the east and west abutment back walls<\/li>\n<li>Completing spot painting of bridge pin and hanger system<\/li>\n<\/ul>\n<\/li>\n<li>Construction on the eastbound bridge also includes:\n<ul>\n<li>Repairing the east abutment back wall<\/li>\n<li>Replacing the sidewalk railing<\/li>\n<\/ul>\n<\/li>\n<li>Construction on the retaining wall on the Wisconsin approach:\n<ul>\n<li>Replacing the block wall crossing under and adjacent to I-94 and parallel to the pedestrian path<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Wisconsin Department of Transportation is rehabilitating the bridges that carry I-94 over the St. Croix River between Hudson, Wis., and Lakeland, Minn.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":6,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":145,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/posts\/12\/revisions\/145"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}