{"id":14,"date":"2022-01-25T02:31:58","date_gmt":"2022-01-25T08:31:58","guid":{"rendered":"http:\/\/projects.511wi.gov\/wis48bc\/delays\/"},"modified":"2026-07-24T13:12:56","modified_gmt":"2026-07-24T18:12:56","slug":"trafficimpacts","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/trafficimpacts\/","title":{"rendered":"Traffic Impacts"},"content":{"rendered":"<p>I-94 remains open to traffic, but motorists will encounter the following on:<\/p>\n<ul>\n<li>Eastbound I-94:\n<ul>\n<li>Three lanes are open to traffic on the eastbound bridge; lanes are restricted to 11 feet in width.<\/li>\n<\/ul>\n<\/li>\n<li>Westbound I-94:\n<ul>\n<li>Two lanes are open to traffic, but one lane has been shifted onto the eastbound bridge.\n<ul>\n<li>The traffic split begins near the 11<sup>th<\/sup> Street overpass.<\/li>\n<\/ul>\n<\/li>\n<li>Westbound I-94 will be reduced to a single lane east of the Carmichael Road interchange (exit 2) from 9 tonight to 5 a.m. Saturday, July 25 to complete concrete patching between the Carmichael interchange and the St. Croix River Bridge.\n<ul>\n<li>This closure also is expected to be in place from 9 p.m. Monday, July 27, to 5 a.m. Tuesday, July 28 and possibly Tuesday night to Wednesday (July 29) morning.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Construction on the westbound bridge is almost complete, and traffic is expected to be switched during nighttime hours Monday through Wednesday, July 27-29. Once the traffic switch is complete:<\/p>\n<ul>\n<li>The westbound I-94 bridge will carry two lanes of westbound traffic and two lanes of eastbound traffic.<\/li>\n<li>The eastbound bridge will carry one lane of through traffic and a ramp lane.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>I-94 remains open to traffic, but motorists will encounter the following on: Eastbound I-94: Three lanes are open to traffic on the eastbound bridge; lanes are restricted to 11 feet in width. Westbound I-94: Two lanes are open to traffic, but one lane has been shifted onto the eastbound bridge. The traffic split begins near [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-default.php","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"class_list":["post-14","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/pages\/14","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/comments?post=14"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/pages\/14\/revisions"}],"predecessor-version":[{"id":195,"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/pages\/14\/revisions\/195"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/i94stcroixriverbridges\/wp-json\/wp\/v2\/media?parent=14"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}