{"id":714,"date":"2017-12-14T12:00:25","date_gmt":"2017-12-14T18:00:25","guid":{"rendered":"http:\/\/projects.511wi.gov\/i94northsouth\/?page_id=714"},"modified":"2018-03-23T15:27:40","modified_gmt":"2018-03-23T20:27:40","slug":"east-and-west-frontage-roads","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/i94northsouth\/east-and-west-frontage-roads\/","title":{"rendered":"East and West Frontage Roads"},"content":{"rendered":"<p>As part of the I-94 North\/South project, the frontage roads along the interstate, between WIS 20 and County Road KR, will be reconstructed.<\/p>\n<h3>Project Updates<\/h3>\n<p><a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/180323_Frontage-Roads-News-Updates_01.pdf\" target=\"_blank\" rel=\"noopener\">March 2018<\/a><br \/>\n<a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/180130_Frontage-Roads_Project-Update.pdf\" target=\"_blank\" rel=\"noopener\">January 2018<\/a><br \/>\n<a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/171220_Frontage-Roads-Project-Overview_Lit-Drop.pdf\" target=\"_blank\" rel=\"noopener\">December 2017 &#8211; Project Overview<\/a><\/p>\n<h3>Estimated Schedule<\/h3>\n<p>January 2018 to mid-summer 2018<\/p>\n<h3>Traffic Impacts<\/h3>\n<ul>\n<li>During construction, both frontage roads will be open to LOCAL TRAFFIC only.<\/li>\n<li>Different phases of the project will require adjusted detour routes that will be announced in advance.<\/li>\n<li>County KR, WIS 20 and WIS 11 will remain open to traffic throughout the duration of the project.<\/li>\n<\/ul>\n<h3>Aerial Plots<\/h3>\n<p><a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/Frontage-Roads-Seg12-13-14-north.pdf\" target=\"_blank\" rel=\"noopener\">WIS 11 &#8211; WIS 20 segment<\/a><br \/>\n<a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/Frontage-Roads-Seg12-13-14-south.pdf\" target=\"_blank\" rel=\"noopener\">County KR &#8211; WIS 11 segment<\/a><\/p>\n<h3>Contact Us<\/h3>\n<p>Heather Sackman, WisDOT Project Manager<br \/>\n414-750-3233<br \/>\n<a href=\"mailto:Heather.Sackman@dot.wi.gov\" target=\"_blank\" rel=\"noopener\">Heather.Sackman@dot.wi.gov<\/a><\/p>\n<p>Cynthia De Vor, Public Involvement Lead<br \/>\n262-510-8901<br \/>\n<a href=\"mailto:Cynthia@devorpr.com\" target=\"_blank\" rel=\"noopener\">Cynthia@devorpr.com<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the I-94 North\/South project, the frontage roads along the interstate, between WIS 20 and County Road KR, will be reconstructed. Project Updates March 2018 January 2018 December 2017 &#8211; Project Overview Estimated Schedule January 2018 to mid-summer 2018 Traffic Impacts During construction, both frontage roads will be open to LOCAL TRAFFIC only. [&hellip;]<\/p>\n","protected":false},"author":38,"featured_media":929,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-714","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/714","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/users\/38"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/comments?post=714"}],"version-history":[{"count":9,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/714\/revisions"}],"predecessor-version":[{"id":958,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/714\/revisions\/958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/media\/929"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/media?parent=714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}