{"id":1469,"date":"2018-10-11T11:47:52","date_gmt":"2018-10-11T16:47:52","guid":{"rendered":"http:\/\/projects.511wi.gov\/i94northsouth\/?page_id=1469"},"modified":"2019-10-14T09:44:26","modified_gmt":"2019-10-14T14:44:26","slug":"27th-street-interchange","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/i94northsouth\/corridor-construction-projects\/27th-street-interchange\/","title":{"rendered":"27th Street Interchange"},"content":{"rendered":"<h3><strong><a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/elm.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-1985 size-full\" src=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/elm.jpg\" alt=\"\" width=\"393\" height=\"707\" srcset=\"https:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/elm.jpg 393w, https:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/elm-167x300.jpg 167w, https:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/elm-248x446.jpg 248w, https:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/elm-47x85.jpg 47w\" sizes=\"auto, (max-width: 393px) 100vw, 393px\" \/><\/a>Elm Road Access Changes<\/strong><\/h3>\n<p>The freeway ramps to\/from I-94 at 27th Street were permanently closed as a part of the reconstruction of I-94. They are being replaced with a new full access interchange to\/from I-94 at Elm Road.<\/p>\n<p>The new Elm Road interchange will be approximately a half mile north of the 27th Street interchange to avoid impacts to the Root River environmental corridor and improve spacing with the Seven Mile Road interchange.<\/p>\n<p>With the removal of the I-94 ramps at 27th Street, a free flow connection was built between West Frontage Road and 27th Street. The new free flow connection was part of the reconstruction of 27th Street between the Milwaukee County line and north of Elm Road.<\/p>\n<p><strong>Schedule<\/strong><br \/>\n<strong>2018<\/strong><br \/>\n\u2022 27th Street access to\/from I-94 was closed mid-October 2018 and will not reopen.<br \/>\n<strong>2019<\/strong><br \/>\n\u2022 Elm Road bridge, over I-94, was constructed.<br \/>\n\u2022 I-94 mainline, under Elm Road, was constructed.<br \/>\n<strong>2020<\/strong><br \/>\n\u2022 Elm Road, between 27th Street and I-94 EAST (SB) entrance\/exit ramps to be constructed.<br \/>\n\u2022 I-94 EAST (SB) and I-94 WEST (NB) entrance\/exit ramps to be constructed.<br \/>\n\u2022 Elm Road will be accessible when the full interchange is completed in late spring.<br \/>\n\u2022 Final project restoration will take place.<\/p>\n<p><a href=\"http:\/\/projects.511wi.gov\/i94northsouth\/wp-content\/uploads\/sites\/105\/Elm-Road-Access.pdf\">View MORE<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Elm Road Access Changes The freeway ramps to\/from I-94 at 27th Street were permanently closed as a part of the reconstruction of I-94. They are being replaced with a new full access interchange to\/from I-94 at Elm Road. The new Elm Road interchange will be approximately a half mile north of the 27th Street interchange [&hellip;]<\/p>\n","protected":false},"author":52,"featured_media":0,"parent":664,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-1469","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/1469","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/users\/52"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/comments?post=1469"}],"version-history":[{"count":23,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/1469\/revisions"}],"predecessor-version":[{"id":1995,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/1469\/revisions\/1995"}],"up":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/pages\/664"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/i94northsouth\/wp-json\/wp\/v2\/media?parent=1469"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}