Updated May 24, 2018: Please note these closures are weather dependent and subject to change.

Thursday (5/24)

– A lane will be closed I-94 SB overnight from WIS 11 to County E (Kenosha) for emergency crash cushion repairs.

– There will be flagging during the day on County H between WIS 11 and County A (Kenosha) for base patching, milling, and paving.

– There will be a full closure overnight beginning with flagging in the evening on County H between WIS 11 and County A (Kenosha) for milling, paving, and base patching.

 

Friday (5/25)

– There will be flagging following the Thursday overnight closure until noon on County H between WIS 11 and County A (Kenosha) for base patching, milling, and paving.

 

Saturday (5/26)

-Only long term closures in effect.

 

Sunday (5/27)

-Only long term closures in effect.

 

Long-Term Closures 

– A lane will be closed until mid-late October EB and WB on WIS 20 for roundabout work at the intersection of County C (Racine).

– County C (Racine) north of WIS 20 to Greenmonte Dr will be fully closed 3/19 until late June for roadway construction.

– The East Frontage Rd from County K (Racine) to Mitchell Ct will be fully closed 3/19 until early June for roadway construction.

– Braun Rd will be fully closed until late May between the East Frontage Rd and West Frontage Rd for roadway construction.

– The intersection of the East Frontage Rd and Louis Sorenson Dr will fully close at 11:59pm 4/5 until early June for roadway reconstruction.

– A lane will be closed I-94 SB until mid-June from Seven Mile Rd to WIS 142 for work zone prep.

– The I-94 NB left shoulder will close overnight (3/13) and last until mid-June from WIS 142 to WIS 20 for shoulder improvements.

– There will be a single NB and SB lane closure 4/6 until early June on County H between Enterprise Dr and WIS 20 for milling, paving, and base patching.

– There will be a full closure of USH 45 starting 3/12 until late August between Church Rd and WIS 20 for road reconstruction. (NOTE – Local and emergency access will be maintained)

– There will be a long-term full closure through early June 2018 of the East Frontage Rd NB/SB from County KR to WIS 20 for roadway construction. (NOTE – local access will be maintained)

– There will be a long-term full closure through early June 2018 of the West Frontage Rd NB/SB from County KR to WIS 20 for roadway construction. (NOTE – local access will be maintained)

– There will be a long-term full closure through early June 2018 of 58th Rd from the East Frontage Rd to the West Frontage Rd for roadway construction. (NOTE – local access will be maintained)

– lanes will be closed Ryan Rd EB/WB from 13th St to 22nd St through Fall 2018 for bridge reconstruction.