{"id":26,"date":"2022-05-16T09:07:01","date_gmt":"2022-05-16T14:07:01","guid":{"rendered":"http:\/\/projects.511wi.gov\/i90-wis16-interchange\/?page_id=26"},"modified":"2022-07-14T10:05:24","modified_gmt":"2022-07-14T15:05:24","slug":"traffic-impacts","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/traffic-impacts\/","title":{"rendered":"Traffic impacts"},"content":{"rendered":"<p>Stage 1<\/p>\n<ul>\n<li>Full closure from Avon Rd. to River Rd. (7\/18\/22 \u2013 9\/30\/22)<\/li>\n<li>Single lane closures on WIS 27 NB &amp; SB from Theisen\u2019s to Avon Rd.<\/li>\n<\/ul>\n<p>Stage 2<\/p>\n<ul>\n<li>Flagging operation from Icon Ave to Theisen\u2019s<\/li>\n<\/ul>\n<p>Stage 3<\/p>\n<ul>\n<li>Full nighttime closures to complete Exit 25 ramps (~ 2 nights per direction)<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Detour <\/strong><\/p>\n<p>WIS 27 and I-90 traffic will be detoured to Exit 28 (WIS 16 interchange) to navigate around full closure from Avon Rd. to River Rd.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stage 1 Full closure from Avon Rd. to River Rd. (7\/18\/22 \u2013 9\/30\/22) Single lane closures on WIS 27 NB &amp; SB from Theisen\u2019s to Avon Rd. Stage 2 Flagging operation from Icon Ave to Theisen\u2019s Stage 3 Full nighttime closures to complete Exit 25 ramps (~ 2 nights per direction) &nbsp; Detour WIS 27 [&hellip;]<\/p>\n","protected":false},"author":61,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-26","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/pages\/26","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/comments?post=26"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/pages\/26\/revisions"}],"predecessor-version":[{"id":39,"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/pages\/26\/revisions\/39"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/i90-wis16-interchange\/wp-json\/wp\/v2\/media?parent=26"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}