{"id":5,"date":"2026-03-12T17:46:39","date_gmt":"2026-03-12T22:46:39","guid":{"rendered":"https:\/\/projects.511wi.gov\/i39marathonus51\/schedule\/"},"modified":"2026-08-18T11:37:15","modified_gmt":"2026-08-18T16:37:15","slug":"schedule","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/i39marathonus51\/schedule\/","title":{"rendered":"Schedule and Traffic Impacts"},"content":{"rendered":"<p><strong>Page last updated: <\/strong>Aug. 18, 2026<\/p>\n<p><strong>Schedule: <\/strong>April 9 to Oct. 31, 2026<\/p>\n<p><strong>Anticipated work scheduled: <\/strong>Crews will:<\/p>\n<ul>\n<li>Continue to work on pavement marking<\/li>\n<li>Install guardrail<\/li>\n<li>Repair concrete pavement<\/li>\n<li>Pave slope along WIS 52<\/li>\n<li>Install curb ramps along Bridge Street and WIS 52 Parkway<\/li>\n<\/ul>\n<p><strong>Traffic impacts (the next 10 days):\u00a0<\/strong><\/p>\n<ul>\n<li>Current Ramp Closed\n<ul>\n<li>WIS 29 westbound to US 51 southbound (expected to open on Aug. 20)<\/li>\n<li>US 51 southbound to WIS 29 westbound (expected to open on Aug. 20)<\/li>\n<\/ul>\n<\/li>\n<li>Future Ramp Closures\n<ul>\n<li>County N northbound off-ramp (expected to begin on Aug. 20)<\/li>\n<li>County N northbound on-ramp (expected to begin on Aug. 20)<\/li>\n<\/ul>\n<\/li>\n<li>Local street lane closures will be occurring along the following streets:\n<ul>\n<li>County N (expected to begin Aug. 20)<\/li>\n<li>Sherman Street (currently closed)<\/li>\n<li>WIS 52 Parkway (currently closed)<\/li>\n<li>Bridge Street (currently closed)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Page last updated: Aug. 18, 2026 Schedule: April 9 to Oct. 31, 2026 Anticipated work scheduled: Crews will: Continue to work on pavement marking Install guardrail Repair concrete pavement Pave slope along WIS 52 Install curb ramps along Bridge Street and WIS 52 Parkway Traffic impacts (the next 10 days):\u00a0 Current Ramp Closed WIS 29 [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":62,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-default.php","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"class_list":["post-5","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/pages\/5","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/comments?post=5"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/pages\/5\/revisions"}],"predecessor-version":[{"id":79,"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/pages\/5\/revisions\/79"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/media\/62"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/i39marathonus51\/wp-json\/wp\/v2\/media?parent=5"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}