I-90 Reconstruction

Campbell, La Crosse, and Onalaska - La Crosse County

Exhibits

Project overview and location

I-90 reconstruction

  • I-90, Round Lake Bridge (Campbell) to Theater Road (Onalaska), in La Crosse County.

I-90/US 53/WIS 35 interchange reconstruction

  • US 53 (Rose Street) from Livingston Street to I-90/US 53/WIS 35 interchange
  • WIS 35 from Campbell Street (La Crosse) to Elm Street (Onalaska)

WIS 157 Bridge construction

  • WIS 157 eastbound and westbound bridges over I-90.

Project location and Project Overview

Preferred alternatives

Construction staging

Detour routes

February 26, 2014 – PIM

Overall project concept

  • Rose Street concept
  • Project overview
  • 2014 Construction: Project overview
  • 2014 Construction: Great River State Trail detour
  • 2015 – 2018 construction
  • Rose Street Bicycle/pedestrian accommodations
  • West George Street current concept
  • West George Street right of way impacts

April 2013 – PAC meeting

September 20, 2012 – PIM

View all maps from this meeting.

  • Project overview
  • 2013 – WIS 157 construction staging
  • I-90/US 53/WIS 35 – Diamond interchange alternative
  • 2013 – Construction
  • 2014 – Construction
  • 2015 – Construction
  • 2016 – Construction
  • Oak Forest Drive at Rose Street
    • Preferred – Traffic signal alternative
    • Roundabout alternative
  • Rose Street bicycle/pedestrian connections
  • Detour plan – Southbound WIS 157 to eastbound I-90
  • Detour plan – Northbound WIS 157 to westbound I-90
  • Preliminary West George Street concepts, Alt. 1
  • Preliminary West George Street concepts, Alt. 2
  • Preliminary West George Street concepts, Alt. 3
  • Preliminary West George Street concepts, Alt. 4

April 12, 2012 – PIM

  • Existing I-90/US 53/WIS 35 (Exit 3) Interchange
  • Planned improvements – The project includes the following measures to repair, maintain, and in some cases improve the existing infrastructure:
    • Replace pavement on I-90, Round Lake to Theater Road
    • Replace bridge deck on County BW
    • Replace pavement between ramp terminals and make bridge improvements at County B interchange
    • Reconstruct US 53/WIS 35, Livingston Street (La Crosse) to Elm Street (Onalaska)
    • Reconfigure US 53/WIS 35 interchange (Exit 3)
    • Replace I-90 structures over Great River State Trail with new box culvert
    • Add third lane (auxiliary lane) in each direction on I-90, between US 53/WIS 35 (Exit 3) and WIS 157 interchanges
    • Perform work on existing WIS 157 structures over I-90