I-39/90 Expansion Project

Illinois state line to Madison, Dane and Rock counties

Alternative #2 chosen for US 14/Humes Road improvements, Janesville

Updated: Jan. 12, 2018

In early December 2017, a business meeting was held to provide an update on the US 14/Humes Road reconstruction project, between WIS 26/Milton Avenue and Deerfield Drive, in Janesville. Information presented at the meeting included construction staging, business access and the anticipated schedule in 2022.

Upon review of business input, as well as feedback from the city of Janesville, Alternative #2 has been selected as the preferred alternative for the US 14/Humes Road construction near the I-39/90 interchange. During construction in 2022, this alternative includes:

  • Short-term ramp closures at the I-39/90 and US 14 interchange (Exit 171B).
  • Closure of US 14, between WIS 26/Milton Avenue and Pontiac Drive, from April to September 2022.
  • Alternative #2 provides a shorter construction duration than other alternatives.

It is important to note that alternate routes are available to local businesses within this segment of US 14/Humes Road in Janesville.

View the exhibits, handouts and presentation from the December 2017 meeting.

Stay involved and informed with the project website, register for project email updates, and follow us on FacebookFacebook