{"id":115,"date":"2025-04-30T11:16:43","date_gmt":"2025-04-30T16:16:43","guid":{"rendered":"https:\/\/projects.511wi.gov\/41rehab\/?page_id=115"},"modified":"2026-07-31T10:56:38","modified_gmt":"2026-07-31T15:56:38","slug":"silver-spring-drive-to-good-hope-road","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/41rehab\/silver-spring-drive-to-good-hope-road\/","title":{"rendered":"Silver Spring Drive to Good Hope Road"},"content":{"rendered":"<h3>2026 Construction Restart:<\/h3>\n<p>Work on I-41, between Burleigh Street and Good Hope Road is scheduled to resume in mid-March 2026.<\/p>\n<h3>2026 Traffic Impacts:<\/h3>\n<p>Long-term lane and ramp closures will be needed to facilitate 2026 construction. Closures are anticipated to begin in mid-March 2026.<\/p>\n<p>During these long-term closures, traffic will be reduced from three lanes in each direction to two lanes in each direction. Traffic may be reduced to one lane in each direction <strong>only during overnight hours<\/strong> with occasional overnight full freeway closures, as needed. In addition to long-term lane and ramp closures, a long-term full closure of Mill Road under I-41 will take place.<\/p>\n<p><a href=\"https:\/\/projects.511wi.gov\/41rehab\/mill-road-structures-project\/\">Learn more about Mill Road structure project here<\/a><\/p>\n<h3>Project improvements for this section include:<\/h3>\n<p>Pavement rehabilitation of the mainline and various ramps, lighting and signing improvements, resurfacing Good Hope Road between the I-41 terminals, beam guard upgrades, signals upgrades, spot barrier replacement, media inlet repairs and replacement. Additionally, turning radii improvements are proposed at the Good Hope Road southbound ramp terminal.<\/p>\n<p><a href=\"http:\/\/projects.511wi.gov\/41rehab\/wp-content\/uploads\/sites\/1351\/burleightogoodhopeoverview.pdf\">View improvement overview<\/a><\/p>\n<h3>Structure improvements included in this section:<\/h3>\n<ul>\n<li>Bridge overlay and painting for the I-41 bridges over the Union Pacific Railroad<\/li>\n<li>Bridge overlay for the I-41 bridges over Carmen Avenue<\/li>\n<li>Painting and repair of the Florist Avenue bridge over I-41<\/li>\n<li>Bridge overlay and painting of the I-41 bridges over US 41 southbound \/ WIS 175 southbound<\/li>\n<li>Bridge overlay of the I-41 bridges over US 41 northbound \/ WIS 175 northbound<\/li>\n<li>Painting of the Good Hope Road bridges over I-41<\/li>\n<li>Replacement of the median sign structure south of Florist Avenue<\/li>\n<li>Repairs on other sign structures<\/li>\n<\/ul>\n<h3>Schedule:<\/h3>\n<p>Work between Silver Spring Drive and Good Hope Road is scheduled to be completed in summer 2027.\u00a0 All work is weather dependent and subject to change.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2026 Construction Restart: Work on I-41, between Burleigh Street and Good Hope Road is scheduled to resume in mid-March 2026. 2026 Traffic Impacts: Long-term lane and ramp closures will be needed to facilitate 2026 construction. Closures are anticipated to begin in mid-March 2026. During these long-term closures, traffic will be reduced from three lanes in [&hellip;]<\/p>\n","protected":false},"author":66,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"class_list":["post-115","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/pages\/115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/comments?post=115"}],"version-history":[{"count":6,"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/pages\/115\/revisions"}],"predecessor-version":[{"id":199,"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/pages\/115\/revisions\/199"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/41rehab\/wp-json\/wp\/v2\/media?parent=115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}