{"id":12,"date":"2026-03-10T09:32:33","date_gmt":"2026-03-10T14:32:33","guid":{"rendered":"https:\/\/projects.511wi.gov\/22gillett\/full-project-overview\/"},"modified":"2026-04-01T10:07:59","modified_gmt":"2026-04-01T15:07:59","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/22gillett\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-24 alignright\" src=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22location.png\" alt=\"\" width=\"371\" height=\"436\" srcset=\"https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22location.png 585w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22location-255x300.png 255w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22location-380x446.png 380w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22location-500x587.png 500w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22location-72x85.png 72w\" sizes=\"auto, (max-width: 371px) 100vw, 371px\" \/>This website details construction operations, traffic impacts, and businesses signing information for the city of Gillett downtown reconstruction project (Project ID 9180-35-00\/71) taking place in 2026.<\/p>\n<p><strong>NEW: Construction will now begin April 13<\/strong><\/p>\n<ul>\n<li><strong>Read press release:<\/strong> <a href=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/wis22start032626.pdf\">WIS 22 construction begins April 7 in Gillett<\/a><\/li>\n<\/ul>\n<p><strong>Project location<\/strong><br \/>\nWIS 22 from Finnegan Lake Road to the WIS 22\/32 intersection in the city of Gillett, Oconto County.<\/p>\n<ul>\n<li><a href=\"https:\/\/projects.511wi.gov\/22gillett\/map\/\">View project location on an interactive map<\/a><\/li>\n<\/ul>\n<p><strong>Project need<\/strong><br \/>\nThe existing pavement and storm sewer systems have reached the end of their useful life and require replacement. Existing pedestrian facilities do not meet ADA standards, and select intersections have deficient geometry that pose safety issues.<\/p>\n<ul>\n<li>For historical project design information, please see the<a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/by-region\/ne\/22gillett\/default.aspx\"> WIS 22 Reconstruction design website.<\/a><\/li>\n<\/ul>\n<p><strong>Proposed Improvements<\/strong><\/p>\n<p>This is a reconstruction-level project. Construction operations include:<\/p>\n<ul>\n<li>New concrete pavement, concrete sidewalk, and concrete curb and gutter<\/li>\n<li>New storm sewer<\/li>\n<li>Culvert replacements<\/li>\n<li>Multiple intersection improvements (view improvements on display below)<\/li>\n<li>Parking lanes between W. Park Street and E. Washington Street<\/li>\n<li>Extension of the Christie Brook box culvert (structure # C-42-0025)<\/li>\n<li><a href=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22display511.pdf\">View WIS 22 Project construction elements on a display map<\/a><\/li>\n<\/ul>\n<p><strong>Anticipated benefits<\/strong><\/p>\n<p>By fully replacing aging infrastructure and incorporating modern design standards, the project addresses critical needs while enhancing safety, accessibility, and overall quality of life in downtown Gillett.<\/p>\n<ul>\n<li>The installation of new concrete pavement, curb and gutter, and associated drainage systems will provide a smoother, more reliable driving surface compared to the existing deteriorated pavement. This upgrade extends the roadway&#8217;s service life, reduces future maintenance requirements, and lowers vehicle operating costs for motorists through decreased wear and tear.<\/li>\n<li>Replacement of the outdated storm sewer system, along with culvert replacements and the extension of the Christie Brook box culvert, will improve drainage capacity and functionality. These improvements help mitigate flooding risks, protect adjacent properties and infrastructure, and support better water flow\u2014contributing to safer conditions during heavy rain events and benefiting emergency response capabilities.<\/li>\n<li>New concrete sidewalks constructed to current ADA standards will ensure compliant, accessible pathways for all users, including individuals with disabilities, the elderly, and families with strollers. Combined with intersection improvements to correct deficient geometry, these changes reduce potential hazards and promote safer pedestrian and vehicle interactions in the downtown area.<\/li>\n<li>Targeted intersection upgrades will address current safety deficiencies by improving sight lines, alignment, and overall geometry. These enhancements are expected to decrease the likelihood of crashes, making travel through Gillett more predictable and secure for drivers, cyclists, and pedestrians alike.<\/li>\n<li>A modernized corridor also contributes to a more attractive and welcoming downtown environment, potentially benefiting community pride, tourism, and economic activity in this rural hub.<\/li>\n<\/ul>\n<p><strong>Schedule<\/strong><\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-35 alignright\" src=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-1024x768.jpg\" alt=\"\" width=\"220\" height=\"165\" srcset=\"https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-1024x768.jpg 1024w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-300x225.jpg 300w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-768x576.jpg 768w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-1536x1152.jpg 1536w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-595x446.jpg 595w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-500x375.jpg 500w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign-113x85.jpg 113w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/roadclosedsign.jpg 2048w\" sizes=\"auto, (max-width: 220px) 100vw, 220px\" \/><\/strong><\/p>\n<p>Construction begins in April 13, 2026, and is expected to finish in October 2026.<\/p>\n<p><strong>Traffic impacts<\/strong><\/p>\n<p>WIS 22 will be closed to through traffic and placed on detour for the duration of the project. The city has utility work with a full closure and detour currently, and another project south of Gillett will affect the detour routes. Three detour routes will be used during construction:<\/p>\n<ul>\n<li><strong>Current detour (during city utility work):<\/strong> WIS 117 to WIS 29 to WIS 160 to WIS 32, then back to WIS 22.\n<ul>\n<li>After the city&#8217;s work is complete (sometime in April), the state detour route will be in place.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Primary state project detour (after city utility work):<\/strong> County R to County H to WIS 32.\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22detour918035.pdf\">View state detour route on a map<\/a> (pdf)<\/li>\n<\/ul>\n<\/li>\n<li><strong>Temporary third detour<\/strong> (for approximately one month during the Cecil bridge project): County E to WIS 32 to WIS 22.\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/22detour918017.pdf\">View 3rd detour route on a map<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Local access will be maintained for residents, businesses, and emergency services within the work zone. Pedestrians will be redirected using existing city sidewalks. WisDOT will coordinate project timing to minimize impacts to local businesses and residents as much as possible.<\/p>\n<p><strong>Temporary Business Signing<\/strong><\/p>\n<p>Temporary business signing may be placed by filling out a WisDOT business signing permit. All temporary business signing needs approval via the permit before placement to ensure it is in a safe location and does not pose a visual distraction or traffic hazard. The temporary business signing permit is free. Costs associated with creating the temporary sign are the responsibility of the business.<\/p>\n<ul>\n<li><a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/workbook\/temporary-signage-guide.aspx\">Click here for WisDOT\u2019s temporary business signing instructions<\/a> and a link to a fillable-form WORD application for the permit.\n<ul>\n<li>Please email or mail the free permit to any of the contacts below.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Business Resource: WisDOT\u2019s In This Together program<\/strong><\/p>\n<p>WisDOT recognizes businesses located in work zones or impacted by detour routes have special needs. WisDOT\u2019s In This Together program is offered to business, organizations and<br \/>\ncommunity leaders as an idea source as they plan for road construction in their area. It includes promotional examples, case studies and a specially designed information for businesses regarding planning ahead, keeping customers informed, and temporary business signage during road closures.<\/p>\n<ul>\n<li><a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/default.aspx\">Visit WisDOT\u2019s In This Together website for business resources.<\/a><\/li>\n<\/ul>\n<p><strong>Project information<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-34 alignright\" src=\"http:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ-300x150.jpg 300w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ-768x384.jpg 768w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ-676x338.jpg 676w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ-500x250.jpg 500w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ-170x85.jpg 170w, https:\/\/projects.511wi.gov\/22gillett\/wp-content\/uploads\/sites\/1501\/phoneinWZ.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>This project will have a dedicated construction project field office and construction project leader. For construction-related questions, please contact the construction project leader. For all other questions, please contact the WisDOT project manager.<\/p>\n<p><strong>Project Construction Leader<\/strong><\/p>\n<p>Luke Hardinger, Project construction leader<br \/>\nE-mail: <a href=\"mailto:luke.hardinger@questllc.biz\">luke.hardinger@questllc.biz<\/a><br \/>\nPhone: 715-323-1306<\/p>\n<p><strong>Construction field office location<\/strong><\/p>\n<p>137 S Lake Street, Gillett, WI 54124<\/p>\n<p><strong>WisDOT Project Manager<\/strong><\/p>\n<p>Kurt Vogel, P.E., Project Manager<br \/>\nWisDOT Northeast Region<br \/>\n944 Vanderperren Way<br \/>\nGreen Bay, WI 54304<br \/>\n(920) 362-1732<br \/>\n<a href=\"mailto:kurt.vogel@dot.wi.gov\">kurt.vogel@dot.wi.gov<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>WisDOT will reconstruct one mile of WIS 22 in downtown Gillett, Oconto County, from Finnegan Lake Road to the WIS 22\/32 intersection. Work begins April 7, 2026, and will finish in the fall of 2026. WIS 22 will be closed to through traffic and detoured for the entire duration of construction.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":63,"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/posts\/12\/revisions\/63"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/22gillett\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}