The purpose of the project is to address the deteriorating pavement condition and extend the service life of WIS 167. The last highway rehabilitation project covering this 3.5-mile segment of WIS 167 occurred in 1997, which consisted of resurfacing and reconstruction of areas thr​oughout the project limits. The anticipated work of this upcoming proposed resurfacing project includes:

  • Pavement base patching
  • Asphaltic milling and ​resurfacing to place a new layer of asphalt on the roadway
  • Guardrail replacement and slope grading in guardrail areas
  • Potential minor culvert repairs

Traffic Impacts

​​During construction, WIS 167 is anticipated to be closed to through traffic utilizing a detour route. The roadway will remain open to businesses and residents.

Schedule

Mid-July to Early September 2022