Weekly Construction Update: July 28-August 1

Posted: July 25, 2014

Weekly construction updates include upcoming lane closures and traffic impacts related to the major Verona Road (US 18/151) reconstruction. Sign up for project updates via email.

Stay connected with the project website and project Facebook page. Facebook

Note - All lane restrictions and work operations are weather dependent and subject to change.

Verona Road work

  • Two lanes open to traffic (in each direction) on new northbound lanes, between the Beltline and Raymond Road.
    • View the traffic staging plans.
    • Work zone speed limit is 30 mph. Drive with caution through the work zones.
    • NOTE: Frontage road speed limits are typically 25 mph. Drive with caution on the frontage roads, especially Britta Parkway.
  • Access remains open to area businesses and neighborhoods.
    • Regardless of any roadwork inconvenience, please continue to patronize area businesses in the Verona Road work zone.
  • Daytime reconstruction work on Verona Road southbound and frontage roads.
    • Work to occur approximately 6 a.m. - 7 p.m. (July 28-Aug. 2).
    • Work will continue on the existing southbound lanes with pavement removals, grading, retaining wall construction and bridge work.
    • East Frontage Road work includes storm sewer and sanitary sewer south of the Atticus Way intersection (traffic maintained on two lanes or with flagging operation).
    • West Frontage Road work, between Summit Road and Freeport Road, will continue with bridge crews working on the exterior pier of the bridge (excavation work and piling). Access to businesses is maintained and open to through traffic.
    • West Frontage Road by Goodwill – sanitary sewer work will start Wednesday, July 30 and continue for the next several weeks. Two-way traffic is maintained.
  • Allied Drive/East Frontage Road, between Thurston Lane and Red Arrow Trail, to be CLOSED with no through access on Tuesday, July 29. Traffic to be re-routed on Red Arrow Trail and Thurston Lane.
  • Hammersley Road cul-du-sac (north of the Beltline) is CLOSED until August 29. No detour posted.
  • Freeport Connection is open to traffic (temporary roadway under Verona Road near Southwest Commuter Path).
    • The Southwest Commuter Path remains open in this area.

Westbound Beltline

  • Nighttime ramp closure from Whitney Way to the westbound Beltline.
    • 8 p.m. - 5 a.m. (July 31-Aug. 1)
  • Nighttime lane closure on the westbound Beltline from Whitney Way to Gammon Road.
    • 8 p.m. - 5 a.m. (July 31-Aug. 1)
  • Nighttime lane closures on the westbound Beltline, between Todd Drive and Seminole Highway.
    • 8 p.m. - 5 a.m. (July 31-Aug. 1)

Eastbound Beltline

  • Nighttime lane closure on the eastbound Beltline from Gammon Road to Whitney Way.
    • 8 p.m. - 5 a.m. (July 31-Aug. 1)
  • Nighttime lane closures on the eastbound Beltline, between Seminole Highway and Todd Drive.
    • 8 p.m. - 5 a.m. (July 31-Aug. 1)
    • Ramps to remain open.

West Beltline Frontage Road (east of Verona Road)

  • CLOSED to through traffic, between Britta Parkway and Whenona Drive (south of the Beltline), until October 15, 2014.
    • Alternate routes are required. Access to area businesses to remain open.

Whitney Way and Gilbert Road intersection

  • Daytime work will occur at Whitney Way and Gilbert Road. Single lane closure may occur along Whitney Way at the intersection.
    • 9 a.m. - 3 p.m.  (July 28-Aug. 1)

Verona Road and County PD (Military Ridge path)

  • Daytime single lane closures may occur on westbound and eastbound County PD (McKee Road) at the Military Ridge overpass.
    • 9 a.m. - 3 p.m. (July 28-Aug. 1)
  • Work continues on bridge construction along the abandoned railroad line, just east of the Verona Road and County PD intersection.
    • This portion of the trail to be closed on north and south sides of County PD until summer 2014.
    • Military Ridge State Trail along Verona Road remains open.