Back to Regions
SouthEast
- Zoo Interchange Project
- I-894 Projects
- I-43 URT Improvements (Capitol Dr. to Hampton Ave.)
- WIS 20 Rehabilitation
- I-43 NORTH-SOUTH (Glendale to Grafton)
- WIS 83 Resurfacing
- US 18 (Bluemound Road) Resurfacing
- Wheatland WIS 50 Reconstruction
- I-43 (Brown Street - Capitol Drive)
- US 18 Bridge Projects
- Zoo Interchange Retaining Pond Improvements
- WIS 241 Resurfacing
- WIS 20 Resurfacing (WIS 31 - Oakes Road)
- WIS 100 Resurfacing - Shepard Ave. to WIS 32
- WIS 36 Resurfacing (Wis 100 - 51st Street)
- WIS 36 Resurfacing (Springfield to Burlington)
- WIS 16 Resurfacing
- WIS 16 Cable Barrier (WIS 190 to County C)
- US 45 Reconstruction (Rawson Ave. to College Ave.)
- WIS 145 Bridge Improvements
- WIS 190 (Capitol Drive) Resurfacing
- WIS 60 Resurfacing - Village of Jackson
- I-41 and I-43 Noise Wall Rehabilitations
- I-41 and Capitol Drive Interchange Improvements
- I-43 Rock Freeway Improvements (WIS 164 to Moorland Rd)
- Greenfield Avenue Reconstruction - S. 56th Street to S. 47th Street
This site provides extended information for construction projects currently underway throughout Wisconsin, with the same real-time conditions information found on the main 511 Wisconsin website.
For information about other plans or studies, visit the Wisconsin DOT website. Statewide real-time traveler information is available by dialing 511 or visiting the main 511 Wisconsin website.